Run a configured schedule
Overview
If you do not use the default launch configuration, you can configure the schedule and then run it.You must configure the schedule before running it.
Run the configured schedule
- In the Test Navigator, expand the project until you locate the schedule.
- Right-click the schedule, and then click Run > Run.
- In the Configurations area on the left, click Test Schedule, and then click the name of the schedule to run.
- Click Run.
Results
While the schedule is running, the reports are updated in real time, and you can see the changes.
Related tasks
Run a schedule or test Set a launch configuration Configure different ports for a location Automating tests Increasing memory allocation Change the number of virtual users during a run Release virtual users from synchronization points Change the problem determination level during a run Interrupting a run