Upgrade a collaborative project
Migrating a collaborative project from a previous minor version to NeoLoad 5.5 is somehow different from upgrading a standard project. The migration process consists in two steps:
- One team member migrates the project onto the collaboration server. Then, the local project must be migrated.
- The other team members check out the remote migrated project from the collaboration server.
- Warning: A collaborative project is migrated once for all. As the migrated project can be opened in NeoLoad 5.5 only, it is advised to make a backup copy of the source project before upgrading the project. See Export a project.
In This Section
Migrate a collaborative project Check out locally a remote project already migrated See Also
Upgrade vs Update Upgrade to NeoLoad 5.5 Update to a corrective version of NeoLoad 5.5
Home