IBM BPM, V8.0.1, All platforms > Authoring services in Integration Designer > Developing business processes > (Deprecated) Routing with Selectors
(Deprecated) Creating a selector
This topic provides instructions on how to create a selector.
Procedure
- In the workbench, switch to the business integration perspective.
- If you have already created a module, select it in the business integration view.
- From the main menu, click File > New > Selector.
- In the New Selector window, specify a module, a folder and a name for the new selector, and click Next.
- In the select an interface window, browse to an existing interface or click New to create one. If you create a new interface here, you will have to create an operation for it before you can use it in the rule group. Create this operation using the interface editor.
Results
This creates a selector, and launches it in a new editor.
- (Deprecated) Selector editor
The selector editor is a graphical editor that you use to visually choose and schedule the processing of components within IBM Integration Designer.- (Deprecated) Specifying a target component for your selector
The target component is the destination where the selector will direct the implementation.- (Deprecated) Choosing dates and times
The selector can be used to schedule the routing of an operation to a specific component for a specific date and time.- (Deprecated) Customizing algorithms for date and time selection
When you want to specialize the date and time selection criteria, you can create your own custom algorithm.- (Deprecated) Standards for date and time selection in a selector
There are a number of ways you can configure your selector. Here are some suggestions that are based on the number and nature of the available destinations.
(Deprecated) Routing with Selectors
Related concepts:
Selectors