Preparing the server for production

 

To finish the resource management and prepare your new server for production, perform these procedures.

  1. Continue the initial program load (IPL) by selecting option 1 (Perform an IPL) from the IPL or Install the System display.
    Notes:

    1. You might see the Add All Disk Units to the System ASP display. You can add the disk units later in this procedure.

    2. You might see the system reference code (SRC) A900 2000 on the control panel display of the system unit. Or you might receive message CPF0975 Console did not vary on on the console display. This SRC and message appear if the QIPLTYPE is set to 2 or if there is no device description for the console display. This SRC and message are normal during the upgrade procedure. The SRC will disappear when you perform a normal IPL later in the upgrade procedure.

      If no workstation on your server is operational when you receive SRC A900 2000, go to SRC A900 2000 recovery.

  2. Sign on to the server as the security officer using the QSECOFR user profile.

  3. At the IPL Options display, enter the correct date and time. Verify that the following values are set as indicated:
            Start print writers = N         Start the system in restricted state = Y         Define or change system at IPL = Y

  4. At the Define or Change the System at IPL display, select option 3 (System value commands).

  5. At the System Value Commands display, select option 3 (Work with system values).

  6. Use the Work System Value Commands display to restore the system values to the settings you recorded in step 3 of the Preparing for the service representative procedure in the Preparing to upgrade the server topic.

  7. After the IPL completes, use the Work with Configuration Status (WRKCFGSTS) command with parameters *LIN *ALL to ensure all communications lines are varied off.

  8. Use the Work with Configuration Status (WRKCFGSTS) command with parameter *DEV to display a list of devices. Note that the console is assigned to the QCTL controller. Vary off all devices except the display station that you are using for the console.

  9. Use the Work with Configuration Status (WRKCFGSTS) command with parameters *CTL *ALL to vary off all controllers.

  10. Find the label location information for the source server. Your service representative should have returned this to you.

    On this worksheet, the service representative indicates controllers and devices that are in different locations than they were on your source server. You must use this information to fix hardware resource names after an upgrade to be able to access the devices on your server.

  11. Set the server to IPL type B and Normal operating mode.

    To find out how to set these values, see Changing your system IPL from the system control panel.

  12. Once the server is set to IPL type B and Normal operating mode, follow these steps to stop and start the server:
    1. Type PWRDWNSYS on the command line and press F4 (Prompt).
    2. Make sure that you select these options for the PWRDWNSYS command:

      • How to end: *CNTRLD

      • Delay time, if *CNTRLD: 3600 (use the default value, in seconds, or the value that you consider appropriate given your software and system settings)

      • Restart after power down: *YES

      • IPL Source: *PANEL

  13. If SRC A900 2000 appears on the control panel when the IPL completes and you are using Operations Console, follow these steps:
    1. Perform an IPL in Manual operating mode on the server to arrive at the dedicated service tools (DST) menu.

      To find out how to set the server to manual mode, see Changing your system IPL from the system control panel.

    2. Then, from the DST main menu, follow these steps to set the console mode system value to Operations Console:

      1. Select option 5 (Work with DST environment) and press Enter.

      2. Select option 2, (System devices) and press Enter.

      3. Select Console mode and press Enter.

      4. Depending on your Operations Console configuration, select either Operations Console (LAN) or Operations Console (Direct) and press Enter.

      5. Exit DST.

      For more information about setting the console mode in V5R3, see the Operations Console topic.

    3. Continue the IPL to sign on.

      This normal IPL should clear SRC A900 2000.

  14. If you want to start device parity on any nonconfigured disk units, do it now. To learn how, see "Starting Device Parity Protection" in Chapter 20. "Working with Device Parity Protection" of the Backup and Recovery Guide.

  15. Perform disk unit management to configure and protect the disks on your server. To do this, you can use the Work with Disk Units option from the Dedicated Service Tools display. To learn how, see Chapter 18. "Procedures for Configuring Disks and Disk Protection" of the Backup and Recovery Guide.

  16. Save the entire server using GO SAVE option 21.

  17. Generate reports of the hardware and configuration objects by issuing the following commands:
    DSPHDWRSC TYPE(*LWS) OUTPUT(*PRINT)
    DSPHDWRSC TYPE(*STG) OUTPUT(*PRINT)
    DSPHDWRSC TYPE(*CMN) OUTPUT(*PRINT)
    DSPHDWRSC TYPE(*PRC) OUTPUT(*PRINT)
    DSPPTF LICPGM(*ALL) OUTPUT(*PRINT)

  18. Print a new system configuration list.

  19. Resume normal operations and verify that all applications run properly.

  20. Tune server performance.

 

Parent topic:

Completing the server upgrade

Related concepts
Performing resource management Performing the server upgrade