Changing from a twinaxial console to an Operations Console
To change from a twinaxial console to an Operations Console, perform a set of steps on both the PC and the system. Before you begin, ensure that you have satisfied all the Operations Console hardware requirements for the PC and the system.
- Changing the console from a twinaxial console to an Operations Console in a non-partitioned or primary partitioned system
To change from a twinaxial console to an Operations Console, use the existing console to perform these steps on the system.
- Changing the console from a twinaxial console to an Operations Console in a logical partition
To change from a twinaxial console to an Operations Console, perform these steps on the system using the existing console before turning off the system or performing an initial program load (IPL).
- Configuring the PC to use the new console type after changing from a twinaxial console to an Operations Console
To change from a twinaxial console to an Operations Console, configure the PC to use the new console type.
Parent topic:
Changing from one console type to another
Related reference
Operations Console hardware requirements