Replace with a project tag
Replacing a project with the content of one of its tags is useful to come back to a version which has been recorded in a previous tag process. The current content is removed and replaced by the content of the tagged project. Contrarily to retrieving a tag, replacing a project overwrites the current project which is still shared.
- Warning: Replacing a project deletes all the current changes of the project. If the current project is not saved onto the collaboration server, all changes are lost.
To replace the content of the current project with a project tag, it is necessary to display a shared project in NeoLoad. The tags list searched by NeoLoad includes the tags created for the current project.
The Share > Advanced > Replace by Tag command displays the list of the tags available, including the Creation_Time tag which stands for the version of the project when it was shared.
Validating the selection reopens the project with the content of the selected tag.
- To replace the content of a project with a tag
- Click Share > Advanced > Replace by Tag.
- Select a tag.
- Click Finish.
Home