Schedule a test
This tutorial details the two methods that can be used to schedule the launching of a test at any given time.
Schedule a test with NeoLoad
The Scenarios tab in the Runtime section makes it possible to select the scenario to be launched. The Advanced button must be clicked.
In the Schedule a test tab, enable scheduling for the test and enter the time and date for its launch. You may also specify whether or not the test should be repeated (e.g. every week).
NeoLoad must be running for the test to start at the specified time.
See Schedule a test.
Schedule a test with the OS
You may use your operating system task scheduler to run NeoLoad using a command line. See Start the Controller. Once the test is completed, we may analyze the results using NeoLoad graphical user interface. Furthermore, by using the option to generate a report in HTML, PDF or XML format, the results then can be automatically processed, in particular when the XML format report is used.
Home