PM iSeries™ ships with i5/OS®, but activate it to use its collecting capabilities.
You must start PM iSeries to take advantage of its data collecting capabilities. You can start PM iSeries by using any one of the following methods:
Use iSeries Navigator
Use iSeries Navigator to activate PM iSeries over multiple systems. When you activate PM iSeries, you can use the Graph History function to see data that was collected days ago, weeks ago, or months ago. You go beyond the real-time monitor capabilities. You have access to summary data or detailed data. Without PM iSeries enabled, the graph data field supports 1 to 7 days. With PM iSeries enabled, you choose the length of time to retain the data.
To start PM iSeries from iSeries Navigator, do the following steps:
Reply to message CPAB02A in the QSYSOPR message queue
When the QSYSWRK subsystem starts, this message asks if you want to activate PM iSeries.
Issue the Configure PM eServer iSeries (CFGPM400) command
From the character-based interface, you can issue the Configure PM eServer iSeries (CFGPM400) command.
You can proceed to the next step in the setup process, which is to determine which transmission method to use to send data to IBM®.
Related concepts
Graph history Determining which PM iSeries transmission method to use